My contact person
Hennlich, Industrijska d.o.o.

Stupničkoobreška 17

Stupnički Obrež

10255 Gornji Stupnik

+385 1 3874334
+385 1 3874336

basic flizz® installed in the preliminary settling basin in Plauen, travel: 53.0 m

In the large-scale wastewater treatment plant in Plauen, our basic flizz® system reliably supplies the scraper bridge with energy. Because of the restricted space availability, the energy supply system was installed on the interior of the basin wall.
A motor cable drum was originally in use in this case, which was no longer capable of reliably rolling up the cable. This resulted in frequent malfunctions. The complete system, consisting of: Series 2500 energy chain + CF9.25.12 chainflex® cable + basic flizz® was installed on-site by our igus® assembly service.

Energy chain system and flexible cables in large-scale wastewater treatment plant  
Go to applied products here
More applications from different sectors can be found here
To vector award