My contact person
Hennlich, Industrijska d.o.o.

Stupničkoobreška 17

Stupnički Obrež

10255 Gornji Stupnik

+385 1 3874334
+385 1 3874336

Assembly instructions for the E4.1L energy chain system

Joining e-chains®

System E4.1 light assembly Place inner links lengthwise, position the outer links sideways on top...
System E4.1 light assembly ...then press the side plates together
System E4.1 light assembly Snap in place, close and engage opening cross bars on one side
System E4.1 light assembly To open, place screw driver on the inside of the fastening mechanism and pry open to the outside.

Installation videos

Connecting two E4.1L chain pieces
Replacing E4.1L chain links