Machining centres
Intelligent energy chain solution
Due to use of the universal modular energy chain system, considerable savings are achieved in the case of modular CNC machine centres.
For the production of machines and equipment, there are many good reasons to decide in favour of pre-harnessed energy supply systems:
igus® takes on responsibility for the entire procurement logistics - from procurement of the necessary special parts, metal sheets or machine parts to provision of the ready-to-install system on the scheduled date.
igus® e-chains® ...
are already being reliably used in hundreds of thousands of applications all over the world.chainflex® cables and plug connections ...
With more than 1,300 cables from stock, igus® offers the largest range of cables specifically for the energy chain. Thanks to the industry‘s largest test laboratory, igus® is the only supplier on the market able to offer a 36 month guarantee on all its chainflex® cables. All commercially available plug-in connections, as well as more than 4,200Configure complete energy supply systems for short or long travels as well as for hanging applications. Simply select required cables to generate interior separation for your application, enter the specific and ambient parameters of your application, and the energy supply expert tool will propose suitable solutions for your energy supply system.
Your benefits | Basic | Standard | STANDARD PLUS | Premium |
ONE supplier - combine suppliers | ☑ | ☑ | ☑ | ☑ |
Reduce assembly time | ☑ | ☑ | ☑ | ☑ |
Reduce failures | ☑ | ☑ | ☑ | ☑ |
No electrical termination needed | ■ | ☑ | ☑ | ☑ |
100% digitally tested | ■ | ☑ | ☑ | ☑ |
No cable surplus | ■ | ☑ | ☑ | ☑ |
Reduce interfaces | ■ | ■ | ☑ | ☑ |
Optimise points of connection / interfaces | ■ | ■ | ☑ | ☑ |
Ready-to-install multi-axis system | ■ | ■ | ☑ | ☑ |
Optimised transport / assembly | ■ | ■ | ■ | ☑ |
One single assembly | ■ | ■ | ■ | ☑ |
One part number / commodity | ■ | ■ | ■ | ☑ |
Plug & Play | ■ | ■ | ■ | ☑ |
Your benefits at a glance | Basic | Standard | Standard plus | Premium |
Reduction of assembly time | ■■□□□ | ■■■□□ | ■■■■□ | ■■■■■ |
Reduction of logistics cost | ■■■□□ | ■■■■□ | ■■■■■ | ■■■■□ |
Procurement optimisation | ■■■□□ | ■■■■■ | ■■■■■ | ■■■■■ |
From more than 15,000 tests performed per year, we have created what is probably the world's largest test database. This database gives us the ability to always select the right product for your specific application. Individual tests for your industry are also possible.
Monday to Friday from 7 am - 8 pm.Saturdays from 8 am- 12 pm.