Safe energy supply to STS crane at the Port of Rotterdam under continuous operation

Roller energy chain travels over 100 metres on a gigantic bridge crane

Profile

  • What was needed: P4.1 roller energy chain
  • Requirements: Long travel with high cable weight, work under continuous operation, fast travel speeds and accelerations
  • Industry: STS crane
  • Success for the customer: The roller energy chain has been running smoothly on the over 100 metre-long travel since 2015. So far, 9,000 operating hours have been completed.
STS crane

Problem

Solution

Roller energy chain P4.1
P4.1 energy chain
Case study of smart plastics in cranes

Robust and smart – How digitally networked energy chains boost STS cranes in the port of Rotterdam